Numurkah Solar Farm

Numurkah Solar Farm

Planning commenced in 2018, with construction planned to be completed in 2019.

Ground Control was engaged in 2018 by Neoen and Downer Utilities Australia to prepare a landscape plan for approx. 10.7 kilometres of buffer planting to the perimeter of a new solar farm in Drumanure, just south of Numurkah Victoria.

Downer and Ground Control worked closely together to determine maximum heights for buffer plantings in all areas to ensure sun exposure to solar arrays was maximised throughout the year.  All 22,000+ plants to be used in planting buffers have been carefully selected indigenous species, were propagated from local seed and planted in Autumn 2019.  The landscape buffer planting is currently under maintenance.

The Numurkah Solar Farm commenced full-scale commercial operation in July 2019.

With over 370,000 solar panels spanning 515 hectares, this renewable energy facility will generate 255 GWh of emission-free, clean, competitive renewable energy per annum to power key infrastructure such as the Melbourne tram network and the Laverton steel works (Neoen press release 19 July 2019).